Design-Build Emergency Repair of the 72" RCP over Brush Creek
Leath & Sons was an On-Call Contractor at the time we were notified of the collapse of the 72" mainline sewer over Brush Creek. We were mobilized and had the by-pass pumping set up within 24 hours. Burns & McDonnell did the engineering portion of the project. The entire Design-Build project was completed in 12 months. On time. On budget.